Customer List of Completed Jobs
The projects listed below show applications completed by Valade Heating & Cooling, Inc. These projects are currently up and running. They include industrial commercial applications ranging from computer rooms to water treatment facilities. Dates range from 1988 to the present.
Project Name
|
General Contractor
|
Contract
Amount
|
Date
Job # |
|
A.A. Stagg High School Palos Hills, IL. |
K. Keup Construction
(Underground pipe) |
$85,500.00 |
09/08/00 00-83 |
|
Aaron’s Shopping Center Gary, IN |
RTU and Ductwork Change Out
|
$79,026.50 |
09/30/04 04-050 |
|
Abbott Adhesives Chicago, IL. |
V.H.C. |
$3,510.00 |
02/12/98 98-132 |
|
Addison Pressure Adjusting
Station Addison, IL. |
Cecchin Plumbing
|
$44,000.00 |
03/06/91 91-025 |
|
Allied Waste Industries Crestwood, IL |
V.H.C.
Computer Room |
$9,100.00 |
01-074 |
|
Air Design Services Bolingbrook, IL. |
Taco Bell
|
$97,000.00 |
08/04/98 98-423 |
|
Alpharma |
Dennis Cole
(Fabricate metal in shop) |
$3,500.00 |
02/26/99 99-029 |
|
American Legion Lansing, IL. |
V.H.C. |
$5,000.00 |
10/29/93 93-114 |
|
Automatic Data Processing Elk Grove Village, IL 6007 |
Computer Room Plenums Liebert Compressor Change
Out |
$14,800.00 $6,250.00 |
04-043 04-059 |
|
Baby Super Store Lansing, IL |
Abrams Construction |
$35,000.00 |
09/08/95 95-256 |
|
Barnhart, Tom |
V.H.C. |
$3,240.00 |
06/04/98 98-287 |
|
Barge Co. Joliet, IL |
VHC |
$10,300.00 |
10/31/03 03-039 |
|
Barron House St. Charles, IL. |
V.H.C. |
$7,500.00 |
12-20-00 00-011 |
|
Bedford Park W.W.T.P. 6601 Old Harlem Av e Bedford Park, IL |
R & W Construction
|
$30,000.00 |
91-091 |
|
Berwyn Public Works 6700 West 30th
Street Berwyn, IL. |
Wil-Freds Construction |
$56,500.00 |
88-102 |
|
Bivona Medical
Technologies Gary, IN. |
Field Tech. (Install Exhaust Fan) V.H.C
(Relocate existing HVAC
equipment) |
$1,153.00 $12,950.00 |
08/09/99 99-106 08-31-02 02-048 |
|
Blastech Gary, IN |
V.H.C. (Replace Furnace) V.H.C. Vent. Project |
$2,550.00 $10,500.00 |
09-19-01 01-111 10-23-01 01-125 |
|
Blout, Dave Monon, IN. |
V.H.C. (Furnace install) |
$2,925.00 |
10/18/99 99-1126 |
|
Bono, Dr. |
V.H.C. |
$2,000.00 |
04/07/95 95-021 |
|
Bombay Company Merrillville, IN |
Eagle
|
$30,000.00 |
02/05/89 89-26 |
|
Bradley Booster Station Bradley, IL |
Bowen Engineering
|
$4,372.00 |
08/07/00 00-072 |
|
Burger King 2222 S.Stoney Island Roosevelt & Wabash Chicago, IL. |
D.A.S. D.A.S. / V.H.C. |
$3,700.00 $22,738.00 |
11/19/93 93-123 11/19/93 93-124 |
|
Burger King Joliet, IL. |
Handon
|
$2,293.00 |
06/24/88 88-31 |
|
C.C.P. Indiana Harbor Portage, IN. |
V.H.C. Gossman Eng. Inc. |
$2,595.00 |
02/20/01 01-019 |
|
Cabot Aurora, IL. |
V.H.C. (Downtown – Stainless
Steel vent Meccon
(Chillers) Meccon
(Clean Room) V.H.C. (Wind Baffles) V.H.C. (Exhaust Fan & S.S.
Duct System Meccon
(Ventilation for Air
Compressor) V.H.C. (Install Fume Exhaust
Hood) V.H.C. (Install Mixer#6 & 7) VHC FRP Pipe & Exhaust Fan |
$9,450.00 $24,750.00 $8,850.00 $4,550.00 $3,160.00 $12,750.00 $4,460.00 $12,000.00 $9,855.00 |
01/24/01 01-009 02/01/00 00-008 04/25/00 00-039 12/15/00 00-108 01-003 00-039 01-039 01-137 02-048 |
|
Calumet City Fire
Department Calumet City, IL |
V.H.C. Rooftop Replacement |
$29,090.00 |
01-075 |
|
Calumet Machine and
Welding Shop Highland, IN. |
V.H.C. |
$12,200.00 |
01/08/99 98-474 |
|
Café Borgia Lansing, IL. |
V.H.C. |
$12,000.00 |
07/29/91 91-069 |
|
Colucci’s Pizza Lansing, IL. |
V.H.C. |
$3,000.00 |
05/17/91 91-048 |
|
Canal Barge Co. Joliet, IL |
VHC |
$13,215.00 |
03-039 |
|
Candy Company Chicago, IL |
V.H.C. |
$12,500.00 |
05/11/93 99-063 |
|
Cannon Steel Chicago, IL |
Cannon Steel Erectors
Per Pat Clark |
$1,200.00 |
01/10/91 91-003 |
|
Canteen Corporation 1925 – 177th
Street Lansing, IL. |
Canteen Corp. 708-895-6000 (Repair Cooler) |
$747.00 |
02/08/99 99-023 |
|
Cargill Industrial Oils
& Lubricants Chicago, IL |
V.H.C. (Repair HVAC Equipment) |
$7,294.00 |
02-28-01 01-057 |
|
Carlen Corp Hammond, IN |
V.H.C. |
$8,900.00 |
12-31-00 |
|
Carmart Drawing |
Miller Construction |
$400.00 |
00-060 |
|
Carol Stream Waste Water Treatment Plant Carol Stream, IL |
Lombard Construction
|
$15,000.00 |
12/10/90 90-063 |
|
Carroll Chevrolet 18 North Main Street Crown Point, IN |
Taylor and Taylor
|
$30,000.00 |
01/23/89 89-014 |
|
Chicago Board of Education 1819 West Perishing Road Chicago, IL |
Abbey Electric Co. |
$16,900.00 |
05/27/88 88-26 |
|
Chicago City Hall Chicago, IL |
Blinderman Construction |
$6,500.00 |
03/01/00 00-017 |
|
Chicago Heights Ford Chicago Heights, IL |
V.H.C. |
$2,100.00 |
02/19/93 |
|
Chicago Transit Authority Chicago, IL |
V.H.C. (Tank removal and
renovation) |
$47,800.00 |
08/20/98 98-450 |
|
Clevis Hagan Valparaiso, IN |
V.H.C. (Heat & Cool Rooftop) |
$3,975.00 |
04/19/99 99-051 |
|
Concrete Tech Lynwood, IL |
V.H.C. |
$7,651.00 |
03/08/00 00-019 |
|
Commercial Lighting Co. 245 Fencl Lane Hillside, IL |
Advantage Mechanical Rooftop Change |
$12,000.00 |
05-01-01 01-052 |
|
Consumer Illinois Water Co University Park, IL |
V.H.C. |
$15,000.00 |
11/28/94 94-073 |
|
Coupling Cover (Cabot) Tuscola, IL |
Meccon |
$2,500.00 |
10/13/99 99-124 |
|
Crafts for Less Lansing, IL |
Greg Severin
|
$25,000.00 |
04/30/96 96-106 |
|
Creative Hair Styling Highland, IN |
V.H.C. |
$10,000.00 |
07/02/93 93-088 |
|
Crown Point WWTP Crown, IN |
Bowen Engineering |
$24,300.00 |
03-110 04/20/05 |
|
Davies Imperial Hammond, IN |
V.H.C. (Replace Unit #9 Cabot
Bldg.) (C02 problem) (Storage Room – Latex
Paint) (Air Door, Clean Room #1
& #2 – Cool Room #1 & #2) (New Addition, Latex Paint Room, Lab) Venting Water Ionization
Room |
$2,466.00 $1,295.00 $3,500.00 $35,000.00 $3,169.00 |
98-561 98-285 95-339 95-331 98-286 |
|
Digital Computers, Inc. |
R.A. Morely, Co. |
$850,000.00 |
1988 |
|
DuPage W.W.T.P. |
Meccon |
$12,320.00 |
99-128 |
|
Dyer Waste Water Treatment
Plant Dyer, IN 46311 |
Bowen Engineering
|
$100,000.00 |
01/07/92 |
|
Edgewood Apartments Lansing, IL |
V.H.C. |
$11,500.00 |
03/06/95 95-011 |
|
Envirite Corporation Harvey, IL |
V.H.C. (Exhaust Fan for Lab)V.H.C. (B-Vent for Machine in new
building) V.H.C. (Install new Piping &
Electrical for Labs) V.H.C. (Replace Rooftop) V.H.C. (ICP Lab) VHC-Water Storage Fac. |
$1,450.00 $400.00 $5,445.00 $7,110.00 $5,250.00 $8,750.00 |
97-402 98-168 01-067 01-071 01-103 03-114 |
|
FAA Chicago, IL McCook, IL McCook, IL |
V.H.C. Paschen Construction V.H.C. Terminal Doppler Gutierrez |
$2,000.00 $20,000.00 |
95-014 94-145A |
|
FAA Midway Control Towner |
V.H.C. (Replace existing A/C
Unit) |
$12,770.00 |
02-049 |
|
Federal Express Chicago, IL |
Hasse Construction |
$6,950.00 |
02-019 |
|
Faith Lutheran Church 4331 S. Arlington Heights Arlington Heights, IL |
Faith Lutheran Church 708-253-4840 |
$106,000.00 |
89-115 |
|
Family Dollar Store Lansing, IL |
Lutz, Briggs & Schultz |
$21,790.00 |
01-131 |
|
First National Bank of IL. Mokena, IL. |
Lagestee-Mulder Construction |
$67,740.00 |
97-406 & 99-071 |
|
Federal Express Bridgeview, IL |
Hasse Construction
(Install Exhaust Fan for
Chem. Area) |
$6,950.00 |
03-31-02 02-019 |
|
Florida Plastics 10200 Kedzie Ave Evergreen Park, IL |
V.H.C
(Two RTU Units) (Office A/C) (Replace Unit Heater) (Replace RTU) (Replace Carrier Spilt) (Silk Screening Project) |
$16,991.00 $2,527.00 $650.00 $1,325.00 $13,000.00 $11,520.00 $38,000.00 |
99-094 99-093 01-012 99-129 01-135 03-053 03-066 |
|
Ford Motor Credit Corp 2200 E. 170th
Street Lansing, IL |
V.H.C. |
$6,500.00 |
93-029 |
|
Forest Park District Calumet City, IL. |
Mertes Construction |
$30,000.00 |
03/12/92 92-030 |
|
Franklin Van Buren Parking Garage Chicago, IL |
Paschen Cons’t Inc. |
$35,000.00 |
12/28/88 88-113 |
|
Freize Residence Chicago, IL |
Knudensen Construction
|
$795.00 |
10-11-01 01-119 |
|
Gary Waste Water Treatment Plant 42nd and
Johnson Gary, IN |
Bowen Engineering
|
$5,450.00 |
10/26/99 99-133 |
|
Gary W.W.T.P. Gary, IN |
V.H.C. |
$ |
04/02/94 94-036 |
|
Gayety Candy Co. Lansing, IL |
VHC- New HVAC Systems |
$15,250.00 |
06/04/04 |
|
Gayety Candy Co. Lansing, IL |
Install New Cooler &
Freezer Units |
$33,000.00 |
08/31/05 05-020 |
|
Glenbrook North High
School |
|
$33,500.00 |
04-053 06/14/05 |
|
General Jones Armory Chicago, IL |
Capital Development Board Ventilation |
$51,400.00 |
02-024 |
|
George O’Day Shops Hammond, IN |
V.H.C. (Infra Red Heaters) (Air Piping) (Move Electric) (Light Circuit) (Exhaust fan) (Rework Air Lines) (Paddle Fans) (Exhaust Hoods) (Fabricate Hood) (Relocate Fans and Hoods) (MUA units, Air Piping
& Gas Piping for New Blgd.) |
$6,469.00 $2,597.00 $788.22 $100.00 $2,265.00 $150.00 $1,206.00 $3,240.00 $1,339.00 $2,265.00 $42,600.00 |
00-098 99-077 99-014A 99-014B 99-014C 99-014D 99-014E 99-014F 99-014G 99-014H 04-028 |
|
Grissom School Bannes Fernway Tinley Park, IL |
Semford |
$35,000.00 |
89-095 |
|
H.B. Fuller 7351 West Devon Drive Tinley Park, IL |
R.A. Morley Co
|
$100,000.00 |
04/07/91 91-037 |
|
H.B. Fuller 312 Hicks Road Palatine, IL |
R.A.Morley H.B. Fuller |
$12,000.00 $55,000.00 $100,000.00 $10,000.00 |
91-021 91-061 91-062 91-063 |
|
H. Wilson Co. |
V.H.C. (Compressor Change) V.H.C
(Rooftop Change) |
$3,975.00 $30,140.00 |
98-239 01-068 |
|
Hadady Machine |
V.H.C. (Heat Shield) |
$577.00 |
98-422 |
|
Hawk Lincoln Mercury Oak Lawn, IL |
V.H.C. |
887.00 |
03/04/99 99-033 |
|
Hazel Crest Maintenance Garage Hazel Crest, IL |
Staunton Construction
|
$10,000.00 |
91-092 |
|
Hazel Crest School Administration. Center 170th – Dixie
Hwy Hazel Crest, IL |
Hazel Crest School
|
$100,000.00 |
04/16/90 90-021 |
|
Health Services Library – UIC West Polk St Chicago, IL |
Capitol Development Board |
$235,000.00 |
05/17/99 99-068 |
|
Hotz Bernards Lansing, IL |
V.H.C. |
$25,000.00 |
03/03/95 95-020 |
|
Howe Development Tinley Park, IL |
Capital Development Board (Upgrade Fire/Safety) |
$85,000.00 |
02/03/00 00-010 11/30/00 00-105 |
|
Illinois Tollway Authority Chicago, IL |
Soderland Brothers
(Duct Cleaning) |
$11,000.00 |
01-099 |
|
Indiana American Water Co. Gary, IN |
Bowen Engineering
|
$67,500.00 |
05-23-01 01-091 |
|
I.S.G. East Chicago, IN |
Fabricate (19) Stainless Steel Spilt Adaptors
|
$8,800.00 |
03-31-03 03-002 |
|
Jeepers Restaurant Lansing, IL |
Prism Builders
|
$103,000.00 |
07/28/98 98-382 |
|
John Bannes School 16835 South Odell Tinely Park, IL |
Semford Construction
|
$170,000.00 |
1988 |
|
Joliet W.W.T.P. Joliet, IL |
Meccon Industries
|
$130,000.00 |
09/27/88 88-65 |
|
K-9 Car Calumet City Police Dept Calumet City, IL |
V.H.C. |
$2,400.00 |
08/09/93 93-098 |
|
Kankakee Federal Kankakee, IL |
Honeywell
|
$20,000.00 |
04/10/92 92-0447 |
|
Kay Manufacturing Calumet City, IL |
V.H.C. (Exhaust Fan for Locker
Room) |
$3,830.00 $850.00 |
98-166 98-221 |
|
Kraft Manufacturing 1 Kraft Court Glenview, IL. |
R.A. Morley
|
$175,000.00 |
1988 |
|
Lagestee-Mulder 2nd Floor
Office Mokena Bank Bldg. Mokena, IL |
Lagestee-Mulder
|
$2,895.00 |
08/25/99 99-114 |
|
Lamp Shade Hours Oak Park, IL |
V.H.C. |
$4,500.00 |
02/09/94 94-011 |
|
Land-O-Frost |
V.H.C. (New Exhaust System |
$3,987.00 |
99-123 |
|
Lan Oak Park District Lansing, IL |
Cody Bauer
(Remodel Shower Rooms) (Boiler Repair) Preschool Renovation |
$755.00 $4,450.00 $128,897.00 |
10/24/00 00-092 98-204 03-029 |
|
Lansing Police Department Lansing, IL |
Captain Keith Smith
(Radio Room Exhaust Fan) V.H.C
(HVAC in Break room) V.H.C. (Temperature Control
Consulting) V.H.C. (Radio Room Exhaust) V.H.C. (Dog Run) (Shooting Range) V.H.C. (Dog Kennels) |
$1,275.00 $3,245.00 $7,725.00 $1,980.00 $3,840.00 $2,495.00 $3,740.00 |
01/30/01 01-011 08/07/00 00-071 04/19/99 99-050 10/20/98 98-478 07-02-93 93-087 98-015 01-125 |
|
Lansing Post Office Lansing, IL |
V.H.C. |
$1,850.00 |
04/20/95 95-023 |
|
La Salle Welding Shop Chicago, IL |
Ornelas Construction |
$9,975.00 |
02-062 |
|
Le Jardin Condo’s Schererville, IN |
V.H.C. (Garage Heat) |
$21,961.00 |
12/04/00 00-106 |
|
Liberty Plaza |
Galt Construction |
$960.00 |
97-485 |
|
Lincoln Park Zoo Birds of Prey Chicago, IL. |
Handon Construction |
$25,000.00 |
02/18/88 88-12 |
|
Lincoln Park Zoo Koala Exhibit Chicago, IL |
Chicago Park District
|
$15,000.00 $11,755.00 |
07/24/92 92-098 |
|
Lover’s Lane |
Robert Slankey
(Repair RT6) |
$500.00 |
99-018 |
|
Loyola Academy Chicago, IL |
Kudensen Construction
|
$15,400.00 |
10-10-01 01-117 |
|
M.C.I. Willowsprings, IL |
Meccon/Bowen
|
$40,000.00 |
01/14/92 92-003 |
|
Martin Luther Booster
Station Gary, IN |
Bowen Engineering
|
$15,000.00 |
10/26/95 95-297 |
|
Meccon Industries Tuscola, IL |
V.H.C. (Pipe for generator) V.H.C. (Coupling Cover) V.H.C. (Compressor Prob.) V.H.C. (Brackets) V.H.C. Dehumidifier Fitting V.H.C. (Fabricate of 10 Stainless
Steel Enclosures) |
$71,590.00 $1,200.00 $13,485.00 $111.00 $1,500.00 $4,300.00 |
01/26/00 00-005 99-124 08/11/99 99-109 98-248 01-056 01-105 |
|
Meccon Industries Lansing, Il |
V.H.C. (Spilt Rings) |
$2,240.00 |
06/11/01 01-078 |
|
Mega Fuel Chicago, IL |
Ornelas Constructions HVAC System |
$17,300.00 |
02-037 05-31-03 |
|
Metra Yard # 47 Chicago, IL |
Holland Mechanical |
$2,146.00 |
10/20/98 98-488 |
|
Merrillville Conservatory Merrillville, IN |
Bowen |
$12,000.00 |
00-101 |
|
Metropolitan Water
Reclamation District- Calumet Chicago, IL |
F.H. Paschen |
$154,625.00 |
12/31/05 03-042 |
|
Midway Airport Chicago, IL |
Meccon Labor & Material for
the Passenger Loading Bridge Equipment |
$81,000.00 |
05-31-04 03-010 |
|
Midway Airport Chicago, IL |
FAA Replace Stand Alone
Marv-Air Unit |
$1,890.00 |
05-31-04 04-061 |
|
Midway Airport Chicago, IL |
Broadway Electric Electric Locker |
$36,485.00 |
04-075 02/08/06 |
|
Miller Foreign Car Matteson, IL |
V.H.C. |
$133,046.00 |
09/21/98 98-468 |
|
Miller Oldsmobile Matteson, IL |
Miller Consolidated |
$90,710.00 |
10/05/98 98-477 |
|
Miller V.W Matteson , IL |
Miller Consolidated
|
$10,450.00 |
06/28-99 99-090 |
|
National Machine Repair Crete, IL |
Lou Novelli
672-7711 |
$4,000.00 |
05/06/88 88-42 |
|
New Berwyn Middle School Berwyn, IL |
Monaco Mechanical
|
$565,000.00 |
03-060 06/01/05 |
|
New Buffalo WWTP New Buffalo, MI |
Bowen Engineering
|
$248,250.00 |
03-052 02/20/05 |
|
New York Apartments |
Midwest Co
(Replace Dryer Exhaust) V.H.C. (Drain Pans) V.H.C. (Flue Pipe Repair) V.H.C. (Dampers) |
$3,860.00 $500.00 $10,700.00 $5,000.00 |
01/29/01 01-101 03/05/01 01-022 00-099 04-024 |
|
O’Donnell, Tim Lansing, IL |
V.H.C. |
$12,000.00 |
01/03/95 95-002 |
Office
Depot
Lansing, IL. |
Skinner
& Broadbent
|
$36,000.00 |
10/09/96 96-326 08/04/98 98-424 |
Palmer’s
House
|
V.H.C.
|
$3875.00
|
00-111
|
Palos
Hills Library
Palos Hills, IL |
Sommers
Co.
|
$25,000.00
|
05/05/92
92-057 |
Peotone
Fire Station
7550 Joliet Peotone, IL |
Semford
Construction
|
$50,000.00
|
1990
|
Pizza
Hut
2747 North Milwaukee Chicago, IL |
Restaurant
Specialties
|
$22,500.00
|
1988
|
Pier One Imports
Chicago, IL |
Advanced Mechanical
|
$5,825.00
|
07-02-00
00-067 |
Planet Honda
Matteson, IL
|
Archineering
HVAC |
$201,153.00
|
02-073
|
Reichart,
R
Lansing, IL |
V.H.C.
|
$4,500.00
|
03/24/95
95-016 |
Reichart,
J
Lansing, IL |
V.H.C
|
$8,000.00
|
03/24/95
95-017 |
Rensselaer
Library
N. Van Rensselaer Rensselaer, IN |
IRAC.
Mast & Son, Inc.
Runyan Roofing |
$15,000.00
$12,000.00 |
10/15/93
93-110 08/17/92 92-105 |
Resthaven
South
16300 Wausau South Holland, IL |
Semford
Construction
|
$33,000.00
|
10/18/88
88-73 |
Rohodia
Vessel #40
|
Field
Tech
(Fabricate Plate) |
$665.00
|
99-118
|
Roman
Decorating
Calumet
City, IL
|
Install
spilt system for the computer room
|
$6,500.00
|
05/31/05
05-019
|
Roseland
Pump Station
|
V.H.C.
(HVAC Install) |
$8,075.00
|
1996
|
Ryder
Truck Rental
1050 Pershing Road Chicago, IL |
Eagle Construction, Inc. |
$35,000.00
|
12/22/88
88-108 |
Saddler
Shoes
Lansing, IL |
V.H.C.
|
$5,890.00
|
05/15/98
98-248 |
Safeco
Corporation
6060 North West Highway Chicago, IL |
Semford
Construction
|
$106,000.00
|
04/23/90
90-023 |
Sandridge
Nature Center
15890 S. Paxton South Holland, IL 60473 |
Mertes Construction
|
$100,000.00
|
92-030
|
Sara
Lee
Chicago, ILStainless Steel Shelves |
V.H.C.
|
$4,275.00
|
10/25/00
00-093 |
Scherer
Management
|
V.H.C.
(Baseboard Heat) |
$3,724.00
|
98-116
|
Schererville
Pump Station
Schererville, IN 46375 |
Semford
Construction
Bowen ConstructionSemford
Construction |
$50,000.00
$10,500.00 $30,000.00 |
03/22/90 90-015 05-14-99 99-067 |
Schererville,
Town of
Schererville, IN 46375 |
Hasse
Construction
Grit Building |
$20,720.00
|
02-004 04-15-04 |
Schroeder
and Lauer
Lansing, IL |
V.H.C.
|
$160.00
|
01/26/94 94-0002 |
Semdberg
Machine Corp.
|
V.H.C.
(Install Heaters in the Locker room) |
$3,480.00
|
98-005 |
Shannon,
Peggy
Romeoville, IL |
V.H.C.
|
$6,500.00
|
03/25/98 98-189 |
Sherwin
Williams
Chicago, IL |
Hasse Construction |
$16,055.00
|
04/23/93 93-036 |
Shurgard
Storage
Calumet
City, IL
|
Acer Construction |
$7,500.00
|
12/31/05 05-063 |
Siemens
Westinghouse
|
V.H.C.(Material) |
$2,600.00
|
00-094 |
Silver
Line
Lansing, IL |
V.H.C.
|
$2,750.00
|
11/20/98 98-564 |
Smith,
Jethroe
Munster, IN |
V.H.C.
|
$12,000.00
|
03/03/95 95-010 |
Smith
Medical Technologies
Gary, IN
|
VHC
|
160,000.00
|
04-051 01/21/05 |
South County Auto BodyLansing, IL |
V.H.C.
|
$5,000.00
|
09/07/90 90-043 |
South Water PurificationChicago, IL |
Bowen
FRP
Pipe & Rework the existing Vent. System |
$334,270.00
|
01-092 03-31-04 |
St. John ChurchHammond, IN |
V.H.C.
(Rebuild Coil – A/coil) V.H.C. (A/C Unit for Kitchen) |
$840.00
$6,147.00 |
98-128 01-138 |
St. John’s Evangelist ChurchFlossmoor, IL |
VHC New Boiler System for the School |
$40,000.00 |
03-116 |
St Victors Church |
V.H.C. (Chiller Piping Valve replacement) |
$800.00 |
10/18/99 99-127 |
Statesville Correctional FacilityJoliet, IL |
Capital Development BoardVentilation |
$399,800.00
|
02-029 |
Stickney Water ReclamationStickney, IL |
Meccon Industries |
$66,000.00
|
07/26/91 91-066 |
SubwayJackson & Van Buren Chicago, IL |
Blindermen Construction |
$47,900.00
|
05/07/97 97-127 |
Surpka, LenHammond, IN |
V.H.C. |
$150.00
|
12/09/00 98-605 |
|
Sushi – Doraku |
Advantage Mechanical HVAC Adjustment |
$3,950.00 |
00-068 |
Switchboard RoomChicago, IL |
Meccon
Industries
|
$16,275.00
|
01/09/99 99-007 |
Taco BellVarious LocationsChicago, IL |
Restaurant Specialties
|
$88,000.00 |
1988 |
Taco BellCalumet City, IL |
Air Design |
$50,000.00 |
05/20/98 98-251 |
Tinely Park Mental Health Center |
Capital Development Board |
$27,5000 |
09-30-01 |
Tinley Park CreekForestry Building147th & Oak Park Ave Oak
Forest, IL |
Winterset Construction |
$45,000.00 |
1988 |
Thorn Creek Water BasinChicago Heights, IL |
Bowen Engineering |
$10,060.00 |
02-077 |
Thornton FractionalScience & Tech Lab Calumet City, IL |
V.H.C. (Office Renovation) V.H.C.
(Ductwork in Cad room) V.H.C. (Office Remodel) |
$15,245.00 $7,889.00 $1,600.00 |
04/14/00 00-038 98-237 98-485 |
Thornton Fractional NorthHigh School Calumet City, IL |
Century Construction
(Physics Lab Renovation) V.H.C. (Replacement of
Thermostat) V.H.C (Steam Heater) (Boiler # 1) (Boiler #2-3) V.H.C. (Guidance Office) V.H.C.
(Bathroom Exhaust) V.H.C. (Compressor Change) |
$42,660.00 $784.00 $5,998.00 $5,658.00 $5658.00 $3,290.00 $975.00 $694.00 |
04/28/00 00-042 05/17/99 99-070 99-083A 99-083B 99-083C 99-112 98-271 98-468 |
Thornton Fractional South High SchoolLansing, IL |
V.H.C. (Nurses Office) V.H.C. (Guidance Office) V.H.C. (Mainframe Computer Room) V.H.C
(201 Computer Room) V.H.C. (Bathroom Exhaust Fans) V.H.C. (Clean Ductwork) V.H.C. (Roof Fan) V.H.C. (Alternate #1) |
$5,095.00 $8,334.00 $1,875.00 $5,500.00 $3,569.00 $1,425.00 $5,500.00 $3,000.00 $1,100.00 $575.00 |
04/21/99 99-053 4/21/99 99-056 06/18/99 99-084 05/30/98 98-281 98-283 98-383 95-247 95-248 98-386 95-249 |
Torrence Avenue Discount Liquors’Lynwood, IL |
V.H.C. |
$504.00 |
03/08/00 00-020 |
UPSAlsip, IL |
Ornelas Construction
|
$53,978.00 |
02-039 |
University of IllinoisMatteson, IL |
Miller Consolidated
Dennis Dills |
$65,790.00 |
03/22/99 99-040 |
University of IllinoisMatteson, IL |
Miller Consolidated
( Addition ) |
$750.00 |
07/30/99 99-105 |
University Of IllinoisChicago Circle Center |
V.H.C.
(Ventilation) |
$535,660.00 |
04-13-01 01-042 |
University Of IllinoisLibrary Of Health Sciences |
Capital Development Board
|
$325,000.00 |
05-31-00 99-068 |
University Of IllinoisWarehouse ProjectChicago, IL |
Meccon Industries
(Replace Rooftops and
Exhaust Fan) |
$223,115.00 |
12-31-01 01-038A |
University Of IllinoisWarehouse ProjectChicago, IL |
Oakbrook Mechanical
(Install New B-Vent
Stacks) |
$21,980.00 |
12-31-01 01-038B |
University Park Waste Water Treatment PlantUniversity Park, IL |
Chappell Construction
|
$25,000.00 |
12/16/93 93-133 |
University Of IllinoisChicago, ILScience & Engineering Lab |
Meccon Industries
|
$8,900.00 |
01-087 |
University Of IllinoisChicago, IL |
Meccon Industries
(Reclaim
Carrier Chiller) |
$1,500.00 |
05-23-01 01-091 |
University Of IllinoisChicago,
IL Chemistry Exhaust Addition |
V.H.C.
|
$22,550.00 |
02-078 |
University Of IllinoisChicago,
IL Chemistry Lab |
VHC
|
$147,500.00 |
02-026 |
University Of IllinoisChicago, ILChicago
Circle Center-3rd/4th Floor |
VHC
|
$152,993.00 |
03-014 |
University Of IllinoisMedicine RestorationChicago, IL |
Brongiel Plumbing
|
$7,000.00 |
04-013 |
University of IllinoisPathology Lab |
VHC
|
$33,100.00 |
04-008 04/02/05 |
Urban MediaChicago, IL |
Meccon
(Refrigeration Piping) (Sheet metal) |
$157,000.00 |
05/24/00 00-049A 06/20/00 00-049B |
Van Dyne CrottySouth Holland, IL |
Field Tech
(Repair Commercial Dryer) (Office Diff. Remove) (Boiler Breechings) (Steam Tunnel) Concrete Tech
(Office Diff. Change) |
$275.00 $5,140.00 $390.00 $1,597.00 $3,950.00 $100.00 |
99-001 99-002 99-003 99-015 99-216 99-017 |
Van Dyne Crotty(continue) |
Concrete Tech
(Office Diff. Change) Field Tech
(Stainless Steel Drop Pan) (Gas Regulator and Funnel) (Fabricate and install
vent steam) (Roof exhaust) (2-Unit heaters Laundry
area.) |
$3,950.00 $100.00 $825.00 $2,182.00 $11,592.00 $11,400.00 $5,480.00 |
99-003 99-015 99-216 99-017 98-632 98-633 99-020 |
Van Leer Containers, Inc.4300 West 130th
Street Chicago, IL |
Ron Krass
Alsip, IL. |
$60,000.00 |
11/11/93 93-118 |
Van NoortLansing, Il |
V.H.C. |
$5,187.00 |
08/11/99 99-108 |
White CastleMokena, IL |
Sundene Construction |
$8,500.00 |
1996 |
White CastleCountry Side, IL |
V.H.C.
(Rooftop & Charge) |
$9,395.00 |
06/06/00 00-054 |
White Castle183rd &
Halstead Chicago, IL |
Tom Bouie
|
$895.00 |
01/20/99 00-009 |
White CastleStore #50 Joliet, IL |
White Castle Systems
(HVAC problem) |
$13,517.00 |
08/10/99 99-107 |
White CastleMerrillville, IN |
V.H.C. V.H.C (Fryer Exhaust) V.H.C. (Exhaust Fan) |
$1,664.00 $1,975.00 $2,600.00 |